• <strong id="di7mz"><form id="di7mz"></form></strong>
    1. <dfn id="di7mz"><dl id="di7mz"></dl></dfn>
        Architectural engineering
        Changle people's Hospital

         
        The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
        The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
         
        Won the 2012 Weifang construction site comprehensive management model project award.
         
        不卡中文字幕在线精品亚洲系列,久久精品女人的天堂AV,国产网站十八禁久久影院,无码国产在线看 中国aV免费精品在线观看 日本欧美日韩亚洲综合区
      1. <strong id="di7mz"><form id="di7mz"></form></strong>
        1. <dfn id="di7mz"><dl id="di7mz"></dl></dfn>